Salfords railway station

Salfords
Looking north
Location
Place Salfords
Local authority Reigate and Banstead
Grid reference TQ285462
Operations
Station code SAF
Managed by Southern
Number of platforms 2
Live arrivals/departures and station information
from National Rail Enquiries
Annual rail passenger usage
2004/05 * 87,795
2005/06 * 96,766
2006/07 * 104,086
2007/08 * 116,602
History
Original company London, Brighton and South Coast Railway
Pre-grouping London, Brighton and South Coast Railway
Post-grouping Southern Railway
8 October 1915 Station opened as Salfords Halt
1 January 1935 Renamed Salfords
National Rail - UK railway stations
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Salfords from Office of Rail Regulation statistics. Please note: methodology may vary year on year.
UK Railways portal

Salfords railway station serves the village of Salfords (including the industrial complexes in Honeycrock Lane and the Bonehurst Road), Surrey, England. It is on the Brighton Main Line 37 kilometres (22.99 mi) south of London Bridge station, and train services are provided by Southern. Southeastern ceased to serve the station from December 2008.

The station has four lines running through it, two express lines that have no platforms and the two that provide the service to and from London 45 minutes, Croydon 25 mins, Redhill 7 mins, Gatwick Airport 7 mins, Crawley 10 mins, and Horsham 20 mins. The ticket office is open weekdays from 6:30 am to 10:30 am. There is an on-demand service announcement facility. A PERTIS ticket machine is also located on each platform.

Contents

History

Salfords station was originally built in 1915 for workers at the Monotype Corporation, which had constructed a factory next to the railway line in 1899. Beside the footbridge on the east side, an advertisement for Monotype is still in situ, although it is hidden by trees. From its opening on 8 October 1915[1] the train service was not advertised and sparse to meet the needs of Monotype Corporation staff. On 17 July 1932 the line was electrified on 750dc third rail and concurrently the station was served by a regular advertised train service. The station name, originally Salfords Halt, was simplified to Salfords on 1 January 1935.[1]

Day Aggregates made use of the open land beside the station to store and transport their loose stones for construction in the area for some time. The sidings used still exist, including a bay platform at the station and most of the machinery used to expel and fill the wagons that transported the stone at the site. Network Rail have a site at the back of platform 1, using it as a base for the continuing improvements to the Brighton main line, in between Selhurst traincare depot and the Three Bridges engineering depot.

On 14 January 2008, the station received a minor upgrade. This involved the replacing of the wooden huts with modern glass waiting areas and the installation of dynamic digital displays with information about the next train.

A second PERTIS machine was installed at the entrance to the Horley-bound platform by 2008. Help points were installed in February 2011 to both platforms.

The PERTIS machine on platform one has been replaced in August 2011 by the installation of quick ticket machine on this platform to facilitate buying of tickets out of hours.

Future developments

A proposal has been put forward to increase the trains at rush hour due to the Gatwick Express merging with Southern,[2]

The Thameslink Programme (formerly Thameslink 2000) project proposes to turn some of the Southern services over to the expanded Thameslink network under First Capital Connect. This will see services that currently terminate at London Bridge continuing through Central London and north wards via the Midland Main Line or East Coast Main Line to destinations such as Luton or Cambridge. This however is not imminent, a Department for Transport whitepaper states only that "the Thameslink Programme will be completed by the end of 2015" and that "interim outputs will be delivered by the end of 2011",[3] leaving Southern as the main operator for several more years to come. The Thameslink Programme is centred around 12 car long trains, thus Salfords station will have its platforms lengthened as they can only currently accommodate 8 car long trains.

There are plans for the former Day Aggregates site and sidings (currently owned by Network Rail ) to be used as an engineering and infrastructure yard to provide vital relief on Eastleigh Yard and Hoo Junction. First GBRf and DB Schenker are the interested parties.

Services

The typical service from the station during the day is one train per hour to London Bridge which stops at local stations to East Croydon then Norwood Junction then fast to London Bridge, and one train per hour to Horsham. There are services to London Victoria at peak times stopping at local stations to East Croydon then Clapham Junction before arriving at Victoria. There are also services to and from Littlehampton and Eastbourne in the morning and evening rush hours.

A Sunday service is only available once an hour for six months over the Summer period.

Preceding station National Rail Following station
Earlswood   Southern
Brighton Main Line
  Horley
  Southern
Horsham to Tunbridge Wells
(via Gatwick and Redhill)
 

References

External links